69-Ton Transformer: Shanghai → Uzbekistan by Road
HEAVY LIFT & PROJECT CARGO

69-Ton Transformer: Shanghai → Uzbekistan by Road

Moving a 69-ton, over-dimensional unit from Shanghai to Uzbekistan crosses thousands of kilometers of domestic road, a land border, and Central Asian inland roads — each with its own permit and infrastructure constraints. We planned the movement end to end: special over-dimensional vehicle, domestic route design, border crossing coordination at the land port, cross-border transport and final delivery — including oversize permits and escort arrangements. The transformer was delivered to Uzbekistan, demonstrating combined heavy-lift and China–Central Asia cross-border capability. Client details are withheld.

Transformer equipmentapprox. 69 tons
INDUSTRY
Heavy lift & project cargo
HANDLING
Transformer equipment, approx. 69 tons

We planned the movement end to end: special over-dimensional vehicle, domestic route design, border crossing coordination at the land port, cross-border transport and final delivery — including oversize permits and escort arrangements.

THE WORK
THE WORK

The transformer was delivered to Uzbekistan, demonstrating combined heavy-lift and China–Central Asia cross-border capability.

THE WORK

Client details are withheld.

OUTCOME
SIMILAR WORK

Different cargo.
Same discipline.

Anonymised work from the same specialist team.

Experience with a 69-Ton Heavy Equipment Unit
01 / 01 — HEAVY LIFT & PROJECT CARGO

Experience with a 69-Ton Heavy Equipment Unit

A single 69-ton unit cannot be treated as container cargo: lifting, center of gravity, lashing, vessel selection and port handling each constrain the plan.

Power-station related heavy equipmentsingle unit ~69 tons
Read the case
YOUR NEXT MOVE STARTS HERE

Tell us what
needs to move.

Cargo. Route. Ready date. A specialist team plans the rest.

Chat on WhatsApp